How Florida Public Bid Court Construction Works
In Florida, a city, county or school district that builds or resurfaces courts usually buys the work through a sealed competitive solicitation, most often an Invitation to Bid (ITB) that goes to the lowest responsive, responsible bidder. State statutes set the floor: advertising periods, bond requirements and licensing. Each local government then layers its own purchasing code on top, so the real rules for your project live in two places, Florida Statutes and your agency's purchasing manual.
This guide walks parks directors, purchasing agents and school facilities staff through how the process works, which statutes matter, and what a court spec should include so the bids you get back are actually comparable. If you're planning new courts, our tennis court construction page shows how a project is built from survey to final lines.
The Statutes That Shape a Public Court Project
When a local project must be competitively awarded
Under section 255.20, Florida Statutes, a county, city or other political subdivision must competitively award a construction project estimated to cost more than $300,000 to an appropriately licensed contractor. For electrical work the trigger is $75,000, which matters when a court job includes new light poles and wiring. The estimate must include labor, equipment, materials and other direct costs, plus a 20 percent overhead factor. The statute also lists exceptions, such as true emergencies or a project where no responsive bids came in.
How long the bid must be advertised
Section 255.0525 sets advertising rules for local government construction. Projects over $200,000 must be advertised in a newspaper of general circulation in the county at least 21 days before bid opening. Projects over $500,000 need at least 30 days. Either way, any pre-bid conference must be noticed at least 5 days ahead. The same section bars splitting one project into pieces to dodge these rules, so phasing a multi-court park into small separate jobs isn't a workaround.
Payment and performance bonds
Section 255.05 requires the contractor on a public construction contract to post a payment and performance bond from a surety authorized in Florida. For county, city and other local work, the awarding official or board may waive the bond on contracts of $200,000 or less. For state work, no bond is required at $100,000 or less. The bond has to be recorded in the county where the courts are built, and the agency can't make a payment until the contractor hands over a certified copy of the recorded bond.
Contractor licensing
Section 489.113(2) says anyone engaged in the business of contracting in Florida must be certified or registered. Electrical work on lighting has to go to a properly licensed electrical contractor unless the prime holds that license. Ask bidders for license numbers and check them on the DBPR license verification site before award. Which license class you require for a given court scope is worth confirming with your building official.
ITB, RFP or ITN: Which One Fits a Court Project?
Florida's procurement statute, section 287.012, defines three sealed methods. Strictly, section 287.057 governs state agencies, but most local purchasing codes borrow the same terms.
- Invitation to Bid (ITB). Used when you can define the scope precisely. Award goes to the lowest responsive, responsible bidder. This is the right tool for most resurfacing and rebuilds, because the work can be fully specified.
- Request for Proposals (RFP). Used when you know the outcome you want but want contractors to propose how, and you'll weigh price against experience and approach. It suits design-build or a new multi-sport complex where layout options are still open.
- Invitation to Negotiate (ITN). Used to find the best way to solve a problem and then negotiate with the top-ranked firms. It's rare for straightforward court work.
If your project needs an architect or engineer, that's a separate process. The Consultants' Competitive Negotiation Act (s. 287.055) requires municipalities, political subdivisions and school boards to select design professionals by qualifications first, then negotiate fees, when the estimated construction cost exceeds the Category Five threshold in s. 287.017(currently $325,000).
How School District Court Projects Differ
School boards follow the education code. Section 1013.45 lets a district build or renovate by competitive bid, design-build, construction management or program management, and caps day labor (district crews) at $600,000, adjusted yearly for inflation. When a district uses competitive bids, section 1013.46 requires award to the lowest responsible bidder. It also requires boards to prequalify construction bidders, and each bid must show the bidder holds the right license.
So a school court job often has an extra gate: the contractor must be on the district's prequalified list before the bid is even accepted. Contractors should apply early, since prequalification can take weeks.
For commodities and services, the State Board of Education's Rule 6A-1.012, F.A.C. requires competitive solicitations from three or more sources above $50,000, and lets districts buy from contracts awarded by other public agencies at the same terms and prices. Whether a district can use that piggyback route for court construction, instead of the Chapter 1013 process, is a question for the district's purchasing and legal staff.
Piggyback and Cooperative Contracts
A piggyback lets an agency buy from a contract another public agency already bid competitively. It can save months. Local codes control whether and how you can do it. Martin County's 2026 Purchasing Manual, for example, allows use of another government's contract when the original solicitation is substantially consistent with county rules, the vendor agrees to extend it, and the terms match. It also bars piggybacking on design contracts procured under the CCNA.
Court work does show up in cooperative form. The Town of Davie's ITB RS-26-63, Court Resurfacing Cooperative Bid states that participating cooperative purchasing agencies may use it. Before piggybacking, check three things:
- Your own code allows it, and for which dollar amounts.
- The original scope actually matches your courts (resurfacing contracts rarely cover new construction, drainage or lighting).
- The contract term is still active and the contractor will extend pricing to you in writing.
What a Public Court Spec Should Include
Loose specs produce bids you can't compare and change orders later. A solid ITB for courts should spell out:
- Scope by court. Number and type of courts, dimensions, and whether it's resurfacing, rebuild or new construction. Attach a site plan.
- Base and drainage. For new courts, the subbase and base you expect, slope requirements, and who owns grading and stormwater. Reference the ASBA and USTA Tennis Courts: A Construction and Maintenance Manual as the standard of care.
- Surface system. Name the acrylic or cushion system and require the manufacturer's application process. Davie's ITB, for instance, lists approved manufacturers and requires their specified process.
- Lines. Tennis, pickleball, blended or youth lines, and line colors.
- Fencing, nets, windscreens and lighting. Include them or explicitly exclude them.
- Accessibility. Accessible routes to and between courts. Our ADA compliance checklist for parks departments covers what to require.
- Contractor qualifications. License class, bonding, insurance, and recent comparable court projects with references.
- Schedule and cure time. Working days, weather days, and when courts can reopen.
- Warranty. Length and what it covers.
Our guide on how to write a sports facilities bid spec was written for HOA boards, but most of the scope items carry over to public projects.
Frequently Asked Questions
Do Florida cities have to bid every court resurfacing job?
Not always. State law sets the minimum, and section 255.20 includes exceptions for some repair and maintenance work. But most local purchasing codes require formal solicitations at much lower amounts. Martin County, for example, sets its formal threshold at the Category Two level, currently $35,000. Check your own code.
Is a performance bond required for a small court project?
For local government contracts of $200,000 or less, section 255.05 lets the awarding official or board waive the bond. Above that, a payment and performance bond is required. Many agencies require bonds below the threshold anyway.
Can a school district use a city's court contract?
Rule 6A-1.012 allows districts to buy from other public agencies' contracts for commodities and services. School construction is generally governed by Chapter 1013, which requires prequalified, licensed bidders. Confirm with your district's purchasing office and attorney before relying on a piggyback for construction.
Should we use an ITB or an RFP for new courts?
If you have engineered drawings and a full spec, an ITB gives you a clean low-bid comparison. If you want contractors to propose layouts or design-build options, an RFP lets you weigh experience and approach along with price.
Mor-Sports Group has built courts since 1986, and our own crews self-perform the work from base to lines. If your agency is scoping a park or school court project, request a free estimate and we'll help you define a scope that bids cleanly.